The following text field will produce suggestions that follow it as you type.

Environmental Impact Statement on the Construction and Operation of a Proposed Mixed Oxide Fuel Fabrication Facility at the Savannah River Site, South Carolina: Chapter 1 Through 8 and Appendices A Through E
Environmental Impact Statement on the Construction and Operation of a Proposed Mixed Oxide Fuel Fabrication Facility at the Savannah River Site, South Carolina: Chapter 1 Through 8 and Appendices A Through E

Environmental Impact Statement on the Construction and Operation of a Proposed Mixed Oxide Fuel Fabrication Facility at the Savannah River Site, South Carolina: Chapter 1 Through 8 and Appendices A Through E

Current price: $23.99
Loading Inventory...
Get it at Barnes and Noble

Size: OS

Get it at Barnes and Noble
The U.S. Department of Energy (DOE) has contracted with Duke Cogema Stone & Webster (DCS) to design, construct, and operate a proposed Mixed Oxide (MOX) Fuel Fabrication Facility that would convert depleted uranium and weapons-grade plutonium into MOX fuel. The proposed MOX facility would be located on the DOE's Savannah River Site in South Carolina. Use of the proposed facility to produce MOX fuel would be part of the DOE's surplus plutonium disposition program. The purpose of the DOE program is to ensure that plutonium produced for nuclear weapons and declared excess to national security is converted to proliferation- resistant forms.
Powered by Adeptmind