The following text field will produce suggestions that follow it as you type.

Barnes and Noble

Loading Inventory...
Evaluation of Future Strategic and Energy Efficient Options for the U.S. Capitol Power Plant

Evaluation of Future Strategic and Energy Efficient Options for the U.S. Capitol Power Plant in Bloomington, MN

Current price: $21.00
Get it at Barnes and Noble
Evaluation of Future Strategic and Energy Efficient Options for the U.S. Capitol Power Plant

Evaluation of Future Strategic and Energy Efficient Options for the U.S. Capitol Power Plant in Bloomington, MN

Current price: $21.00
Loading Inventory...

Size: OS

Get it at Barnes and Noble
The U.S. Capitol Complex in Washington, D.C., comprises some of the most historic and symbolic buildings in the nation. The steam and chilled water required to heat and cool these buildings and related equipment is generated and distributed by the Capitol Power Plant (CPP) district energy system. Portions of the CPP system are now 50 to 100 years old and require renewal so that reliable utility services can be provided to the U.S. Capitol Complex for the foreseeable future.
Evaluation of Future Strategic and Energy Efficient Options for the U.S. Capitol Power Plant
provides comments on an interim set of publicly available consultant-generated options for the delivery of utility services to the U.S. Capitol Complex. The report provides recommendations to bring the interim options to completion, including suggestions for additional analyses, so that the CPP can be best positioned to meet the future strategic and energy efficiency requirements of the U.S. Capitol Complex.
The U.S. Capitol Complex in Washington, D.C., comprises some of the most historic and symbolic buildings in the nation. The steam and chilled water required to heat and cool these buildings and related equipment is generated and distributed by the Capitol Power Plant (CPP) district energy system. Portions of the CPP system are now 50 to 100 years old and require renewal so that reliable utility services can be provided to the U.S. Capitol Complex for the foreseeable future.
Evaluation of Future Strategic and Energy Efficient Options for the U.S. Capitol Power Plant
provides comments on an interim set of publicly available consultant-generated options for the delivery of utility services to the U.S. Capitol Complex. The report provides recommendations to bring the interim options to completion, including suggestions for additional analyses, so that the CPP can be best positioned to meet the future strategic and energy efficiency requirements of the U.S. Capitol Complex.

Find at Mall of America® in Bloomington, MN

Visit at Mall of America® in Bloomington, MN
Powered by Adeptmind